NGV SEQUENTIAL SYSTEM TUNING SOFTWARE AND HARDWARE C/W ENGINE ON STAND

TECHNICAL SPECIFICATIONS

Engine Specification

  1. 4G 15 Engine
  2. Megavalve ( 12 Valve)
  3. Fuel Injection
  4. Complete with stand
  5. Complete with ECU
  6. Complete display board and meter
  7. Complete ignition switch
  8. Aluminium petrol tank ( 3 litre)
  9. Fire extinguisher

Engine good running condition on stand

 

ECU NGV controller/ sequential type

  1. Working Voltage: 9-16V
  2. Rated Voltage: 12 VDC
  3. Working Current: 10-12A
  4. Injection NGV Type: sequential Injection 4 cylinders
  5. Input Signal: original injection petrol signal, fuel pressure signal, water temperature signal, gas temperature signal, vacuum pressure signal, oxygen sensor signal.
  6. Ambient Temperature: -40 – +120 C
  7. Waterptoof level: IP54 flush resistant
  8. Connection: 3 – 6 Pin
  9. Diagnostics connector: RS232 or USB
  10. Controller Set ( Lap Top )
  11. Diagnosis software
  12. Max inlet gas pressure: 25Mpa
  13. Max working pressure: 20Mpa
  14. 2nd stage output pressure: 0.7Mpa-2.5Mpa
  15. Working temperature: -40° C-+120’C
  16. Pressure stage number: 2nd stage
  17. Working voltage: 8-16V
  18. Max flow: :280 nm’/h

 

Main components of CNG conversion kits

  1. ECU D06/D02/AC300(ECU, Map Sensor, Micro switch, Wiring Harness)
  2. CNG/NGV Reducer
  3. Rail Injector
  4. Filling Valve
  5. Pressure Gauge
  6. High Pressure Steel Pipe
  7. CNG/NGV Pipes (Vacuum Pipe, Injection Pipe, Circulating Pipe, Low Pressure Pipe, Bellow, The Straps)
  8. High pressure solenoid valve
  9. Filling Valve
  10. Pressure Gauge
  11. CNG/NGV Filter
  12. Micro switch

 

NGV tank

Capacity 65 L

Model : Type II (semi fibre)

 

Complete with

  1. Tank Valve
  2. Refilling Valve
  3. Steel pipe NGV use
  4. Tank Bracket

 

  • Aluminium fuel tank to convert a gasoline burning engine to one that also runs on natural gas (CNG).
  • CNG fuel tank with the regulator, which reduces tank pressure from 3600 psi to 125 psi.
  • Fuel is then fed to a parallel fuel rail and to new, secondary injectors plugged into an adapter
  • A wiring harness plugs into the factory engine-control unit and intercepts throttle information, sending it to a new fueling computer which slightly alters the data and passes it to the CNG injectors through a parallel wiring harness.